182,000m2
Foundation
23,800 m2
Wet Area
Highlights
Stakeholders
Client
ADAC
Consultant
Architectural & Engineering Consultant
Main Contractor 1
TAV -CCC-ARABTEC
Main Contractor 2
Trojan General Contracting LLC
Objectives
Waterproofing — the system shall carry a 20-year warranty
Protective coating — completion of outstanding snags across 180,000 m² of existing floor coating, in support of the main contractor, ahead of handover
Solution
Foundation — 182,000 m² of fully bonded HDPE membrane, including treatment to 900 pile heads.
Wet areas — 23,800 m² of cementitious coating.
Floor coating repairs & snagging— 180,000 m²
Solutions Applied
Gallery
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Message from the Lead
Protect Middle East was engaged as a waterproofing subcontractor for both the substructure and superstructure, working under several main contractors. All works were executed in line with the approved drawings and method statements, and certificates of appreciation were awarded on completion in recognition of PME's performance.