182,000m2
Foundation
23,800 m2
Wet Area
IMG_3796_no_timestamp_112929197.jpg

Highlights

Stakeholders

Client

ADAC

Consultant

Architectural & Engineering Consultant

Main Contractor 1

TAV -CCC-ARABTEC

Main Contractor 2

Trojan General Contracting LLC

Objectives

Waterproofing — the system shall carry a 20-year warranty

 

Protective coating — completion of outstanding snags across 180,000 m² of existing floor coating, in support of the main contractor, ahead of handover

 

Solution

Foundation — 182,000 m² of fully bonded HDPE membrane, including treatment to 900 pile heads.

 

Wet areas — 23,800 m² of cementitious coating.

 

Floor coating repairs & snagging— 180,000 m²

Message from the Lead

Protect Middle East was engaged as a waterproofing subcontractor for both the substructure and superstructure, working under several main contractors. All works were executed in line with the approved drawings and method statements, and certificates of appreciation were awarded on completion in recognition of PME's performance.