3_165230329.JPG
Intrusion Resistant Vault Walls
3_165230329.JPG

Highlights

Stakeholders

CONSULTANT

SBSI Engineering Consultancy.

Main Contractor

Protect Middle East LLC.



Objectives

The project involves the conversion of an existing building into a functional bank facility.

 

The primary objective was to construct a secure vault within a confined basement, beneath an exposed and load-restricted ground-floor slab. The structural elements — walls, slab and cover — had to be engineered to satisfy international banking classifications, All activities also had to be coordinated with concurrent building transformation works to avoid operational disruption.

Solution

The engineered solution uses high-security reinforced concrete walls, a specialised slab cover, and targeted foundation strengthening to safely carry the newly imposed structural loads. For intrusion resistance and environmental protection, the installation incorporates steel security tang bars, a certified Chubbsafes Centurion EN 1143-1 Grade VII vault door, security-rated ventilation provisions, and full waterproofing to the vault floor and exposed slab to prevent moisture ingress.

Used brands


Commercial Tower Dubai

Apartment Hotel Dubai